Arglass emphasized that the new batch plant and cullet return system had to be designed with the best available technology and with a layout to provide for high quality, highly flexible and efficient production. EME is proud of the decision made by Arglass to cooperate with the company on this exciting and challenging project.
The facility, with a production capacity over 125,000 tons per year, is situated in Valdosta, Georgia, USA. Work on the site of the plant has already begun and the first shipments of the EME equipment are scheduled for end of Q1 2020.
The furnace, supplied by EME’s sister company Nikolaus Sorg, is set to start up at the end of 2020 with full operation by Q1 2021.