Falorni Tech Glass Melting Technology
Filtraglass
Banner

EME: successful commissioning at Industria Vidriera de Coahuila

After installation / commissioning of the first Batch Plant in 2012, EME has delivered the second Batch Plant in 2019 and commissioned it successfully before the COVID-19 pandemic

EME has commissioned the second EME Batch House including automatic cullet return system for Mexican container glass manufacturer Industria Vidriera de Coahuila (IVC) at their plant in Piedras Negras.

After installation / commissioning of the first Batch Plant in 2012, EME has delivered the second Batch Plant in 2019 and commissioned it successfully before the COVID-19 pandemic.

IVC’s new Batch Plant supplies batch for furnace 5, and possibly furnace 6 with a total capacity of 950 tpd in flint and amber glass production.

The EME design integrated economic concrete silos with a head house in steel, state-of-art equipment, engineering and fabrication allows high efficiency of the batch plant.

Raw material charging, weighing, mixing and batch transport is controlled from a specialized EME control system.

Sign up for free to the glassOnline.com daily newsletter

Subscribe now to our daily newsletter for full coverage of everything you need to know about the world glass industry!

We don't send spam! Read our Privacy Policy for more information.

Share this article
Related news