Banner
Filtraglass
Banner
Falorni Tech Glass Melting Technology

SORG Group builds third furnace for Rubin, Bulgaria

Is there a better sign of customer satisfaction than ordering a second furnace? There is – when the customer orders a third one

The SORG Group is proud to announce the construction of a third furnace for Rubin at its factory in Pleven, Bulgaria. This latest order follows the successful delivery of the two previous furnaces in recent years.

The furnace is a gas-fired regenerative end-port furnace with SORG Deep Refiner. The system has a melting area of approximately 92 square metres and is designed to produce soda-lime glass containers in the glass colours flint, amber, and green. The glass conditioning system consists of a distribution channel of type SORG STW and four forehearths of type SORG STF, whereby the two outer forehearths are equipped with alcoves.

Nikolaus SORG was responsible for the furnace design and engineering. In addition to the fossil heating system, the scope of supply includes the complete electrical heating system consisting of a melting booster, barrier booster and throat booster, the waste gas system, other furnace equipment and the SCADA system. The installation of the equipment and its commissioning were carried out by Nikolaus SORG specialists.

EME provided the engineering for the batch-related equipment, including the delivery and supervision of the installation. Two EME-NEND 2® Batch Chargers are used to feed the batch.

The steel and refractory construction, heating up, anchoring and full melting of the furnace were carried out by SKS.

The SORG Group would like to thank Rubin for their renewed trust in the performance of the group and wishes them a successful furnace campaign.

Sign up for free to the glassOnline.com daily newsletter

Subscribe now to our daily newsletter for full coverage of everything you need to know about the world glass industry!

We don't send spam! Read our Privacy Policy for more information.

Share this article
Related news