Page 36 - Glass Machinery Plants & Accessories no. 2/2018
P. 36

Full cooling power is ensured
              HOT-END WORK                                                      during the entire process cycle
         Hot-end work
                         HEYE





                      full cycle



                cooling for



              high speed




               production
























             Conventional cooling of the blow mould unit operates only in certain


             mould positions. Consequently, consistent cooling of the mould

             cannot be ensured for the entire forming cycle at blow side, resulting in

             less container stability and less production speed.



             N     EW BLOW MOULD              scopic tubes with large cross-   double telescopic tubes provide

                   AXIAL COOLING
                                                                               for maximum volume flow. In
                                              sections provide for maximum
                     The latest Heye blow
             mould axial cooling is capa-     volume flow. Thanks to an         the area of the telescopic tubes,
                                                                               the flow path is nearly straight;
                                              improved cooling piece design,
             ble of permanently cooling the   optimized flow paths are ensured.   in the area of the ball joints it is
             moulds during the entire process   This provides increased stability,   redirected very slightly. The cool-
             cycle. Thus, compared to other   better quality and higher pro-   ing piece distributes the cooling
             cooling systems, a much bet-     duction speeds. The axial cool-  air in fan-shaped pattern equally
             ter cooling performance can be   ing can be refitted on existing   on the mould halves.
             achieved. Regardless of mould    IS-machines.
             open or closed position, full cool-                               EASY JOB CHANGE
             ing power is ensured during the   OPTIMIZED FLOW PATHS              A specially developed cooling
             entire process cycle. Double tele-   Large tube cross-sections and   piece holder enables to perform



          34    glass machinery plants & accessories 2/2018
   31   32   33   34   35   36   37   38   39   40   41