Page 63 - Glass Machinery Plants & Accessories no. 2/2018
P. 63

PRODUCTION PROCESS
                                                             FOR TUBULAR GLASS


              - A full range of products avail-
                able from 5 ml to 100 ml suc-
                cessfully embraced by biotech
                and pharma labs.
             t Asolvex:
                6OJRVF  5ZQF  *  HMBTT  XJUI  B
                low aluminium level
              - On the market since 2000
                after 10 years of development
                by SGD Pharma R&D team.
              - New  packaging  possibilities
                for use with sensitive prod-
                ucts : Blood derived prod-       1
                ucts including albumen,             Step 1: Tube feeding
                                                The raw materials are glass tubes supplied by globally renown
                Nutritional products (inject-   manufacturers such as Schott and NEG.
                able), Biological products,     Clear or amber, the tubes are made of neutral borosilicate glass (5.0
                Medication from genetic         expansion range) with a high degree of hydraulic resistance.
                engineering…                    The tubes are loaded by robot onto a rotative machine.
              - Approved by 100% of cus-
                tomers, SGD Pharma delivers
                today 1 million vials made of
                Alsovex glass per day.

               Social   and   environmen-
             tal stakes leads SGD Pharma
             to build and set up its strategy
             taking into account sustainable
             development.
               SGD Pharma commits to
             reduce its impact on the society
             and on the planet. Th company
             can rely on a corporate iden-
             tity, strong values and employees’
                                                 2  Step 2: Forming
                                                The tubes are heated, shaped and cut to give the dimensional
                                                parameters in three main steps:
                                                1. Shoulders and neck forming (including 100% on-line dimensional
                                                 inspection)
                                                2. Tube parting – heating and cutting to set vial height
                                                3. Bottom glazing – heating, glazing and cooling
   58   59   60   61   62   63   64   65   66   67   68